logoShaping Tomorrow's Built Environment Today

Interpretations to Standard 15-1992

Share This

NOTE: All documents linked from this page are in pdf_icon.png PDF-format.

pdf_icon.png Interpretation IC 15-1992-1 – August 24, 1992, revised December 17, 1992 (Ref. classification of high vs. low probability systems in Section 5)

pdf_icon.png Interpretation IC 15-1992-2 - December 17, 1992 (Ref. scope of Subsection 2.2(b) and the placement of certain building types among the occupancy categories in Section 4)

pdf_icon.png Interpretation IC 15-1992-3 – April 2, 1993 (Ref. Subsections 7.4 and 11.13.1; specifically in relation to Footnote a) of Table 2 and Rules 3 and 6 under Subsection 7.4)

pdf_icon.png Interpretation IC 15-1992-4 – June 27, 1993 (Ref. Subsections 5.2.1 High-Probability Systems, 7.2.4 Ventilated Spaces, and 11.13.4)

pdf_icon.png Interpretation IC 15-1992-5 – June 27, 1993 (Ref. Subsection 10.4 concerning pressure relief valves used as pressure vessel protection and specifically to Subsection 10.4.2.3 (dual relief valve requirements))

pdf_icon.png Interpretation IC 15-1992-6 – August 4, 1993 (Ref. Table 2, Sections 7.4.1 and 7.4.2 regarding Group A-3 and B-3 refrigerants)

pdf_icon.png Interpretation IC 15-1992-7 August 30, 1993 (Ref. Subsection 13.7 Self Contained Breathing Apparatus (SCBA))

pdf_icon.png Interpretation IC 15-1992-8 – October 26, 1993 (Ref. Subsections 5.2.2 Low-Probability System, 7.4.2 General System Application Requirements; 11.13 Machinery Room, General Requirements; Table 1 Refrigerant and Amounts; and Table 2 System Application Requirements)

pdf_icon.png Interpretation IC 15-1992-9 – December 6, 1993 (Ref. when compliance is required; specifically 2.2 (parts replaced and components added), 13.6 Storing Refrigerant, and 11.13.2.1 and 11.13.2.2 (sensor compliance))

pdf_icon.png Interpretation IC 15-1992-10 – December 6, 1993 (Ref. Subsection 5.2.1 High Probability Systems and to Interpretation No. IC 15-1992-4)

pdf_icon.png Interpretation IC 15-1992-11 – January 28, 1994 (Ref. the type of sensor required by 11.13.2.1 for machinery rooms enclosing equipment using Group A1 refrigerants. This issue was first addressed in interpretation IC 15-1989-1 which was superseded when ASHRAE 15-1992 was published) 

pdf_icon.png Interpretation IC 15-1992-12 – December 17, 1993 (Ref. paragraph 7.2.4 and Table 1, Refrigerant and Amounts)

Close